Owner supervision of the 330 kV and 110 kV feeder lines of Mustvee substations

Location: Mustvee municipality ja Jõgeva municipality, Jõgevamaa
Year: 2024
Customer: Elering AS

In the course of the works, a new 330/110 kV overhead line with a total length of 11.5 km (L356) was built, the existing line was dismantled and a 5.7 km long 110 kV overhead line (L104B) was constructed in the same corridor, and the old 13 km long 110 kV overhead line (L158) was dismantled. The tower heights range from 22 to 39 m.

AS Infragate Eesti 2025 © Kõik õigused kaitstud
AS Infragate Eesti 2025 © Kõik õigused kaitstud

asukoht: Mustvee vald ja Jõgeva vald, Jõgevamaa

aasta: 2024